{"id":4937,"date":"2023-04-29T18:42:17","date_gmt":"2023-04-29T16:42:17","guid":{"rendered":"https:\/\/indeks.mk\/?p=4937"},"modified":"2023-04-29T18:42:17","modified_gmt":"2023-04-29T16:42:17","slug":"fillon-ofenziva-e-ndertimit-pagesa-e-kestit-te-pare-per-ndertimin-e-autostrades-manastir-prilep-tetove-gostivar-gostivar-bukojcan-trebenishte-qafethane","status":"publish","type":"post","link":"https:\/\/indeks.bilten.mk\/?p=4937","title":{"rendered":"Fillon ofenziva e nd\u00ebrtimit\/ Pagesa e k\u00ebstit t\u00eb par\u00eb p\u00ebr nd\u00ebrtimin e autostrad\u00ebs Manastir-Prilep, Tetov\u00eb-Gostivar, Gostivar-Bukoj\u00e7an, Trebenisht\u00eb-Qaf\u00ebthan\u00eb"},"content":{"rendered":"<p>Sipas Programit p\u00ebr financimin e infrastruktur\u00ebs rrugore p\u00ebr projektin Korridori 8 dhe Korridori 10d p\u00ebr vitin 2023, t\u00eb miratuar n\u00eb seanc\u00ebn e Qeveris\u00eb s\u00eb Republik\u00ebs s\u00eb Maqedonis\u00eb s\u00eb Veriut t\u00eb mbajtur m\u00eb 23 mars t\u00eb k\u00ebtij viti, si dhe pas publikimit t\u00eb tij n\u00eb Gazet\u00ebn Zyrtare, transferimi i par\u00eb \u00ebsht\u00eb b\u00ebr\u00eb n\u00eb llogarin\u00eb e Nd\u00ebrmarrjes Publike p\u00ebr Rrug\u00ebt Shtet\u00ebrore (PBBP) p\u00ebr realizimin e k\u00ebtij projekti m\u00eb t\u00eb madh infrastrukturor n\u00eb historin\u00eb e shtetit. NJPDP-s\u00eb i jan\u00eb paguar mjete n\u00eb vler\u00eb prej 7.254.000.000 denar\u00eb ose 117.000.000 euro.<\/p>\n<p>\u201cP\u00ebrve\u00e7 detyrimeve ligjore nga ligji special dhe Marr\u00ebveshja e n\u00ebnshkruar me kontraktorin Bechtel-Enka Konsorcium, si dhe n\u00eb p\u00ebrputhje me Programin e Qeveris\u00eb, k\u00ebto mjete jan\u00eb t\u00eb destinuara p\u00ebr mobilizim, staf me mekanizim, ngritjen e kampeve, laboratorit dhe punime t\u00eb tjera nga kontraktori p\u00ebrpara fillimit t\u00eb aktiviteteve t\u00eb nd\u00ebrtimit n\u00eb linjat:<\/p>\n<p>Seksioni 1 \u2013 Autostrada Tetov\u00eb \u2013 Gostivar, me gjat\u00ebsi t\u00eb parashikuar rreth 17.5 kilometra.<br \/>\nSeksioni 2 \u2013 autostrada Gostivar \u2013 Bukoj\u00e7an, me gjat\u00ebsi t\u00eb parashikuar rreth 30.3 kilometra.<br \/>\nSeksioni 3 \u2013 autostrada Trebenisht\u00eb \u2013 Strug\u00eb \u2013 Qaf\u00ebthan\u00eb, me gjat\u00ebsi t\u00eb parashikuar rreth 17.5 kilometra.<br \/>\nSeksioni 4 \u2013 Autostrada Prilep \u2013 Manastir, me gjat\u00ebsi t\u00eb parashikuar rreth 39.3 kilometra.<br \/>\nN\u00eb periudh\u00ebn e ardhshme do t\u00eb kryhen pun\u00ebt p\u00ebrgatitore, si regjistrimi i lokacioneve, p\u00ebrgatitja e projekteve urbanistike, projektet baz\u00eb, q\u00ebllimi i t\u00eb cilave \u00ebsht\u00eb fillimi i procedurave p\u00ebr shpron\u00ebsim dhe projektim.<\/p>\n<p>Dhjetori 2027 \u00ebsht\u00eb planifikuar si periudha e p\u00ebrfundimit t\u00eb punimeve p\u00ebr t\u00eb kat\u00ebr seksionet. Dometh\u00ebn\u00eb, punimet nd\u00ebrtimore n\u00eb t\u00eb gjitha k\u00ebto trase rrugore duhet t\u00eb p\u00ebrfundojn\u00eb n\u00eb nj\u00eb periudh\u00eb 57 mujore.<\/p>\n<p>Korridoret 8 dhe 10-e jan\u00eb projekti m\u00eb i madh strategjik i infrastruktur\u00ebs me interes komb\u00ebtar p\u00ebr shtetin, sipas Nd\u00ebrmarrjes Publike p\u00ebr Rrug\u00ebt Shtet\u00ebrore.<\/p>\n<p>Si\u00e7 thon\u00eb nga atje, n\u00eb 32 vitet e fundit n\u00eb vend jan\u00eb nd\u00ebrtuar dhe v\u00ebn\u00eb n\u00eb p\u00ebrdorim 186 kilometra autostrad\u00eb ose 5.8 kilometra autostrad\u00eb n\u00eb vit.<\/p>\n<p>\u201cKjo Marr\u00ebveshje parasheh nd\u00ebrtimin e rreth 110 kilometra autostrad\u00eb n\u00eb 4.7 vitet e ardhshme, ose 23 kilometra autostrad\u00eb n\u00eb vit. Me nd\u00ebrtimin e tyre krijohen 8000 vende t\u00eb reja pune dhe vler\u00ebsimi \u00ebsht\u00eb q\u00eb n\u00eb 5 vitet e ardhshme t\u00eb kemi nj\u00eb rritje t\u00eb PBB-s\u00eb prej 2% n\u00eb vit.<\/p>\n<p>Me nd\u00ebrtimin e k\u00ebtyre autostradave p\u00ebrfundimisht p\u00ebrfundohet rrjeti i korridoreve rrugore evropiane \u2013 8 dhe 10-d n\u00ebp\u00ebr Republik\u00ebn e Maqedonis\u00eb s\u00eb Veriut.<\/p>\n<p>P\u00ebr shkak t\u00eb p\u00ebrmasave t\u00eb p\u00ebrgjithshme t\u00eb projektit q\u00eb ka t\u00eb b\u00ebj\u00eb me nd\u00ebrtimin e Korridorit 8 dhe Korridorit 10-d, por edhe n\u00eb interes t\u00eb publikut, JPDP ka qen\u00eb sa m\u00eb transparent gjat\u00eb gjith\u00eb k\u00ebsaj kohe dhe ka ekspozuar p\u00ebr publikun \u00e7do segment t\u00eb zbatimin e detyrimeve ligjore, protokolleve dhe t\u00eb gjitha procedurave t\u00eb tjera t\u00eb nevojshme.<\/p>\n<p>Mb\u00ebshtetja e publikut t\u00eb gjer\u00eb p\u00ebr k\u00ebt\u00eb projekt historik \u00ebsht\u00eb jasht\u00ebzakonisht e r\u00ebnd\u00ebsishme. Prandaj, JPDP do t\u00eb vazhdoj\u00eb t\u00eb informoj\u00eb publikun n\u00eb m\u00ebnyr\u00eb t\u00eb detajuar, me koh\u00eb dhe transparente p\u00ebr t\u00eb gjitha fazat dhe detajet rreth nd\u00ebrtimit t\u00eb projektit m\u00eb t\u00eb r\u00ebnd\u00ebsish\u00ebm infrastrukturor n\u00eb vendin ton\u00eb\u201d, p\u00ebrfundon Nd\u00ebrmarrja Publike p\u00ebr Rrug\u00ebt Shtet\u00ebrore.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Sipas Programit p\u00ebr financimin e infrastruktur\u00ebs rrugore p\u00ebr projektin Korridori 8 dhe Korridori 10d p\u00ebr vitin 2023, t\u00eb miratuar n\u00eb seanc\u00ebn e Qeveris\u00eb s\u00eb Republik\u00ebs<\/p>\n","protected":false},"author":14,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[44],"tags":[],"class_list":["post-4937","post","type-post","status-publish","format-standard","hentry","category-maqedoni"],"_links":{"self":[{"href":"https:\/\/indeks.bilten.mk\/index.php?rest_route=\/wp\/v2\/posts\/4937","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/indeks.bilten.mk\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/indeks.bilten.mk\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/indeks.bilten.mk\/index.php?rest_route=\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/indeks.bilten.mk\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=4937"}],"version-history":[{"count":0,"href":"https:\/\/indeks.bilten.mk\/index.php?rest_route=\/wp\/v2\/posts\/4937\/revisions"}],"wp:attachment":[{"href":"https:\/\/indeks.bilten.mk\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=4937"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/indeks.bilten.mk\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=4937"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/indeks.bilten.mk\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=4937"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}